Tuesday, April 22, 2014

Work Resumes On Causeway

File photo
Work on the Noden Causeway is resuming.

The highway over the bridge is being reduced to one lane with reduced speed limits, signal lights and flaggers in place during the construction period.

The rehabilitation of the bridge is scheduled to end this fall.