
The Minnesota Department of Transportation is replacing two bridges.
Spokesperson Walter Leu says the work will be done by the same contractor but can't be done until after the July 4 holiday.
Work will be done by October.
Both construction sites will be reduced to one lane controlled by traffic signals.